BYD Battery Manufacturing
New Energy Project Case

BYD Battery Manufacturing

Providing professional flexible busbar solutions for BYD Company

Project Location

Shenzhen, China

Completion Date

April 2024

Project Scale

1600A system

Project Duration

5 months

BYD Battery Manufacturing

Client: BYD CompanyIndustry: New EnergyLocation: Shenzhen, ChinaDuration: 5 monthsCompletion Date: April 2024

Project Background & Challenges

  • Complex power requirements for battery production using flexible busbar technology
  • Varying loads across production lines requiring electrical busbar systems
  • Strict safety standards compliance for industrial busbar applications
  • Dynamic load balancing requirements with flexible copper busbar systems

Solution

  • 1600A flexible copper busbar system design with advanced technology
  • Dynamic load balancing implementation using electrical busbar systems
  • Enhanced safety features integration
  • Real-time monitoring and control

Project Results

25% increase
Production Efficiency
Zero
Safety Incidents
15%
Energy Savings
60%
Downtime Reduction

Products Used

1600A Flexible Copper Busbar SystemsSafety interlocks for electrical busbarLoad monitoring for industrial busbar applicationsEmergency shutdown systems with flexible busbar technology

Project Gallery

Project image 1

Client Testimonial

"Professional flexible copper busbar manufacturer solution that met all our stringent requirements for battery manufacturing with advanced electrical busbar systems."

Wang Ming

Production Director

Project Information

Client
BYD Company
Industry
New Energy
Location
Shenzhen, China
Project Scale
1600A system