Our Projects
Explore our successful flexible busbar solutions and electrical busbar systems projects that demonstrate our expertise as a leading flexible copper busbar manufacturer in custom busbar design and industrial busbar applications.
Huawei Data Center Expansion
High-density flexible busbar solution for cloud infrastructure expansion with advanced electrical busbar systems
View Details
BYD Battery Manufacturing
Flexible copper busbar systems solution for lithium battery production lines with industrial busbar applications
View Details
CATL Energy Storage
High current busbar system for battery energy storage facility with flexible busbar solution and copper busbar technology
View Details
Midea Industrial Complex
Modern industrial busbar applications for manufacturing facility upgrade with flexible copper busbar manufacturer solutions
View Details
Metro Line 14
Flexible busbar solution for underground metro power distribution with IP68 waterproof busbar technology
View Details
Steel Mill Modernization
High current busbar solution for steel production modernization with flexible copper busbar systems
View Details
50MW Solar Farm Power Distribution
Flexible busbar solution for large-scale solar farm with electrical busbar systems technology
View Details
Power Capacity Expansion Project for Data Center of a Scientific Research Institution in Shenzhen
Flexible busbar solution for a data computer room power capacity expansion, connecting low-voltage cabinets to PDUs and precision cooling equipment in a Shenzhen research facility.
View Details
Data Center Project at a Base in Hangzhou
Flexible busbar deployment for a Hangzhou data center requiring power cabinet to bus duct connections in a space-constrained construction environment.
View Details
Intelligent Manufacturing Base Project of a Major Energy Group in Deyang, Sichuan
Large-scale flexible busbar deployment for a modern intelligent manufacturing base, providing 6400A to 1000A multi-specification power distribution across complex cable trench and bridge routing paths.
View Details
New Energy Battery Factory Project in Suzhou, Jiangsu
TMRYV-1600A flexible busbar solution for a new energy battery manufacturing facility, replacing a bulky multi-cable assembly with a compact, high-flexibility power distribution system.
View Details
New Materials Technology Industrial Park Project in Fuzhou, Fujian
Flexible busbar solution for a new materials industrial park production line in Fuzhou, where embedded conduit constraints and multi-turn routing paths demanded a high-flexibility power distribution approach.
View Details
Intelligent Manufacturing Industrial Park Project in Chongqing
Low-smoke halogen-free flexible busbar deployment for a Chongqing industrial park, connecting low-voltage cabinets to high-power equipment across short terminal paths where rigid bus duct was infeasible.
View Details
Energy-Saving Project of a Commercial Complex in Shanghai
B1-WDZA-TMRYY flexible busbar solution for a Shanghai commercial complex energy-saving retrofit, connecting new low-voltage cabinets to ice storage cooling cabinets within extremely narrow installation spaces.
View Details
Multi-Floor Industrial Workshop Project in Zhongshan, Guangdong
Cross-floor flexible busbar power distribution for a Zhongshan industrial workshop, providing 500A to 800A service from the 4th-floor low-voltage cabinet to workshops on the 1st, 4th, and 5th floors through trenches and bridges.
View Details
Hainan Food Group Factory Power Distribution Project
Deployed Yanghua high-current flexible busbar solution to replace a problematic multi-split cable system at a large food group's factory in Hainan, eliminating persistent bias current issues and installation bottlenecks.
View Details
Huizhou Large Industrial Factory Power Distribution Project
Applied Yanghua TMRYY-1250A flexible busbar for power transmission between low-voltage cabinets and workshop power cabinets in a densely equipped industrial plant, replacing a traditional solution that had previously caused safety incidents.
View Details
Qingdao Industrial Park Multi-Factory Distribution Project
Implemented IP68-rated flexible busbar with universal protective armor to connect the low-voltage distribution room to multiple factory main distribution boxes across a large industrial park with extensive outdoor installations.
View Details
Wenzhou Special Transformer Power Distribution Project
Provided flexible busbar solution for a special transformer project connecting transformers to low-voltage cabinets, enabling on-site cut-and-use installation with flexible path adaptation and neat aesthetic finish.
View Details
Xingtai Chinese Herbal Medicine Processing Plant Distribution Project
Deployed IP68-rated flexible busbar between box transformers and power cabinets in a Chinese herbal medicine processing factory where tight cabinet space and high current demands made traditional multi-piece solutions impractical.
View Details
Southwest Headquarters Office Building Power Distribution Project
Supplied B1-level fire-rated flexible busbar for the low-voltage distribution system of a large construction company's headquarters building, connecting diesel generators to low-voltage cabinets and multi-floor distribution boxes via vertical shaft installation.
View Details
Huizhou Industrial Outdoor Long-Distance Distribution Project
Delivered a 2500A IP68 flexible busbar solution for an industrial project requiring hundreds of meters of outdoor cable laying under a tight construction schedule, deployed via pay-off machine for efficient pipe-piercing installation.
View Details
Changsha Telecom Building Internal Power System Project
Implemented flexible busbar for connecting low-voltage cabinets to UPS power cabinets across four floors of the Changsha Telecom Building, using vertical shaft installation with compact, lightweight, joint-free continuous runs.
View Details
Industrial Park Expansion Power Distribution Project, Zhongshan
A 100-meter cross-building power connection project delivering 1000A and 800A from Building A's low-voltage distribution room to Building B's workshop main box, utilizing Yanghua flexible busbars with IP68 protection for indoor bridge and outdoor buried pipe installation.
View Details
Industrial Mechanical and Electrical Engineering Project, Shenzhen Baoan
A space-constrained industrial M&E project in Shenzhen where a combination of four flexible busbar types replaced conventional cabling, enabling direct bending inside narrow cabinets and long-distance bridge laying without intermediate joints.
View Details
New Energy Vehicle Equipment Manufacturing Plant Renovation, Chongqing
A new energy automobile industry transformation project where Yanghua flexible busbars replaced multi-cable installations in extremely confined spaces, reducing wiring complexity and enabling efficient construction within narrow equipment manufacturing plant environments.
View Details
University Teaching Building Power Distribution Project, Beijing
A new university teaching building construction project deploying flexible busbars across 630A to 1250A specifications for multi-level power distribution, from low-voltage cabinets to power boxes and air-conditioning equipment, installed within existing narrow bridge trays.
View Details
Large Steel Enterprise Power Distribution Project, Fujian
A 3200A flexible busbar solution for a major steel producer, connecting transformers to low-voltage cabinets using copper bar direct overlap connections without additional joints, with onsite cut-to-length capability for flexible installation in narrow bridges and cabinets.
View Details
Subway Electrical System Emergency Repair Project, Shenzhen
An emergency repair project for a Shenzhen subway public electrical system where busbar connectors burned out due to a short circuit, requiring rapid power restoration within a tight timeframe using flexible busbars that could be cut and used on site without pre-customization.
View Details
New Energy Company Large-Scale Industrial Expansion Project, Shenzhen
A multi-scenario industrial expansion for a new energy company involving three distinct power distribution challenges: 8000A capacity upgrade using 6x1600A busbars in trenches, 2000A LV-to-filter cabinet connection via 2x1000A IP68 busbars, and a long-distance multi-turn 1600A single-conductor run to a second-floor power box.
View Details
Printing Factory Power Distribution Emergency Repair, Shenzhen
An emergency power restoration project at a Shenzhen printing factory where a section of the original distribution system exploded due to a fault. High-current flexible busbars enabled same-day repair and immediate production resumption through onsite cut-to-length installation without factory pre-customization.
View Details
Zhanjiang Real Estate Development Power Distribution Project
A new real estate development in Zhanjiang, Guangdong, deployed 1600A and 2500A universal flexible busbars for main power distribution, replacing conventional rigid busbar trunking to address tight installation spaces.
View Details
Guizhou Renhuai Hospital Rooftop HVAC Power Busbar Rectification Project
A hospital in Renhuai, Guizhou, required a high-current outdoor power connection from the ground-floor distribution room to rooftop air conditioning units over a nearly 100-meter vertical run using flexible busbars rated to IP68.
View Details
Yueyang Vocational College Photovoltaic Grid-Connection Project
A vocational college in Yueyang, Hunan, deployed 1600A and 2000A flexible busbars for its photovoltaic project, connecting grid-tied inverters to low-voltage cabinets through mixed trench and bridge laying routes.
View Details
Shenzhen Longgang Residential Building Power Distribution Project
A residential building in Longgang District, Shenzhen, utilized a 2000A flexible busbar to connect transformers to low-voltage cabinets, overcoming severe space constraints and complex routing with multiple turns.
View Details
Shenzhen Transformer Capacity Expansion and Renovation Project
A transformer capacity expansion and renovation project in Shenzhen deployed 1600A universal flexible busbars within narrow power distribution cabinets, replacing rigid busbar connections to simplify turning and termination.
View Details
Zhongshan Garden Factory Power Distribution Room Project
A factory in Zhongshan, Guangdong, deployed 1000A universal flexible busbars to interconnect power distribution cabinets, leveraging the compact form factor and high current capacity for long-distance trench laying without intermediate joints.
View Details
Wuhu New Energy Company Factory Power Distribution Project
A new energy company's factory in Wuhu, Anhui, deployed a 2500A flexible busbar with IP68 protection for bridge-laid connections between low-voltage cabinets and workshop power cabinets in an industrial manufacturing environment.
View Details
Kunshan Industrial Computer Room Power Renovation Project
A legacy computer room renovation in an industrial facility in Kunshan, Jiangsu, used 630A and 1000A universal flexible busbars in double-assembly configuration to achieve 2000A capacity within extremely tight spaces with multiple turns.
View Details
Huzhou Power Distribution Cabinet Project — Flexible Busbar and Bus Duct Connection
Flexible busbar solution connecting transformer to low-voltage cabinet in a space-constrained power distribution room, replacing conventional bus duct where installation clearance was insufficient.
View Details
Ningbo Industrial Enterprise — 2000A Flexible Busbar Power Distribution Project
High-current flexible busbar installation connecting low-voltage cabinets to workshop power cabinets at a manufacturing enterprise, using 1600A and 2000A universal flexible busbars for efficient single-conductor power distribution.
View Details
Dongguan Packaging Manufacturing Factory — Emergency 2500A Flexible Busbar Retrofit
Emergency replacement of fire-damaged 2500A power distribution cables with TMRVV1600A and TMRVV800A high-current flexible busbars, restoring factory production in minimal time.
View Details
Baotou Aluminum Industrial Park — IP68 Flexible Busbar Power Distribution Room Retrofit
Retrofit of transformer-to-low-voltage cabinet connections in an aluminum industrial park, replacing hot-spot-prone conventional busbars with point-to-point IP68 flexible busbars for enhanced safety.
View Details
Hangzhou Wanxiang Innovation Energy City — 3200A Flexible Busbar for Battery Industry Power
3200A double-split flexible busbar solution connecting diesel generators to low-voltage cabinets at a world-class battery industry base, replacing an expensive conventional solution in narrow installation space.
View Details
Huizhou Zhongkai CIMC Intelligent Valley Industrial Park — Multi-Rating Flexible Busbar Distribution
Tiered power distribution using 1600A, 800A, and 630A universal flexible busbars from low-voltage cabinets to workshop power boxes across the CIMC Intelligent Valley Industrial Park.
View Details
Shenzhen Beterui New Energy — IP68 Flexible Busbar Long-Distance Inter-Building Connection
Long-distance IP68 flexible busbar installation for a new energy company's large factory complex, using 1600A double-split busbars to deliver 3200A across thousands of meters without intermediate joints.
View Details
Foshan Home Appliance Manufacturing Factory — 2500A Flexible Busbar Retrofit with Bus Duct Integration
Time-critical 2500A power distribution upgrade using 1250A high-current flexible busbars configured for single/double operation, integrated with existing bus duct infrastructure in a confined installation space.
View Details
Old Factory Building Renovation in Dongguan Industrial Park
Comprehensive power distribution upgrade for a renovated factory building using rodent-proof flexible busbar solutions with joint-free integrated laying.
View Details
Boiler Room Power Renovation for Large Commercial Complex in Baoding
Ultra-high-current 4000A flexible busbar deployment resolving chronic overheating and breaker failure issues in a commercial complex boiler room renovation.
View Details
Chemical Factory Power Distribution Upgrade in Dengfeng
Replacement of multi-split cable scheme with ZC-TMRYY flexible busbar from box-type substation to low-voltage cabinets in a chemical factory, achieving cost reduction and simplified construction.
View Details
Chemical Distribution Room Renovation in Zibo
1000A double-splice flexible busbar solution replacing bulky 5×240 mm² multi-splice cables in a narrow bridge installation at a chemical distribution room.
View Details
Large Chemical Enterprise Multi-Point Flexible Busbar Deployment in Hubei
Comprehensive single-phase flexible busbar deployment across multiple interconnection points including low-voltage cabinets, equipment power boxes, and generator outlets at a major chemical enterprise in Hubei.
View Details
Shenzhen Distribution Room Transformer Expansion and Reconstruction
Transformer capacity expansion from 315KVA to 800KVA using 1600A universal flexible busbar to replace rigid bus duct in a space-constrained distribution room with tight project schedule.
View Details
China Southern Power Grid Community Capacity Expansion in Longhua, Shenzhen
Rapid same-day transformer and busbar replacement from 800KVA to 1600KVA using Yanghua flexible busbar with on-site cut-to-length capability for immediate power restoration.
View Details
Logistics Park Energy Storage Project in Ganzhou
1600A flexible busbar replacing 3×300 mm² multi-strand cables for PCS-to-battery DC side connection in a logistics park energy storage system.
View Details
Photovoltaic Project for a Major Energy Group in Tianjin
High-current flexible busbar deployed as the busbar outlet solution for a large-scale photovoltaic project in Tianjin, replacing traditional rigid copper bar connections to overcome on-site installation challenges.
View Details
TCL Intelligent Equipment Energy Storage Project in Guangdong
Flexible busbar deployed between energy storage converging cabinets and low-voltage cabinets for TCL Intelligent Equipment, featuring IP68-rated continuous laying across complex outdoor trench routes spanning hundreds of meters.
View Details
Rooftop Distributed Photovoltaic Power Station in Nanchang, Jiangxi
Flexible busbar solution connecting medium and low-voltage cabinets to converging cabinets in a rooftop distributed photovoltaic power station in Nanchang, leveraging high flexibility for direct turning and simplified cable routing.
View Details
Photovoltaic Grid-Connected Project in Changsha, Hunan
A 2000A universal flexible busbar deployed for a photovoltaic grid-connected power station in Changsha, utilizing trench-based laying with IP68 protection and zero-joint integrated installation for long-term stable operation.
View Details
Aofeng Energy Storage Project in Dongguan Industrial Park, Guangdong
A 2000A universal flexible busbar used to connect energy storage converging cabinets to the low-voltage distribution room in a Dongguan industrial park, featuring IP68-rated jointless laying for outdoor trench installation with repeat procurement from the client.
View Details
Internet Baodi All-Day Fast Charging Center in Yangpu District, Shanghai
500A and 630A flexible busbars deployed at a fast charging center in Shanghai, connecting low-voltage cabinets to ground-level charging hosts across 200 meters of indoor-outdoor routing in confined spaces with IP68-rated joint-free installation.
View Details
Rooftop Photovoltaic Project in Guangzhou Conghua, Guangdong
Flexible busbar solution connecting photovoltaic grid-connected cabinets to low-voltage cabinets via bridge-based point-to-point laying in a narrow rooftop space with multiple turning points in Guangzhou's Conghua district.
View Details
Industrial and Commercial Energy Storage Project in Longgang, Shenzhen
Universal flexible busbar deployed for an industrial and commercial energy storage project in a factory area in Shenzhen's Longgang district, using bridge and conduit laying methods for reliable power distribution connections.
View Details
Dongguan Languan New Energy Qinshang Rooftop Distributed Photovoltaic Project
A rooftop distributed photovoltaic project in Dongguan utilizing 1250A and 630A high-current flexible busbars for grid-connected cabinet to low-voltage busbar connections, eliminating joints and reducing construction time.
View Details
Hubei Distributed Photovoltaic Grid-Connection Project
A distributed photovoltaic project in Hubei Province where flexible busbars replaced a multi-split 240 mm² cable plan, delivering a more cost-effective grid-connection solution between the PV array and the low-voltage busbar.
View Details
Foshan Shishi New Energy Photovoltaic Power Generation System
A 1600A high-current flexible busbar deployment for a photovoltaic power generation system in Foshan Datang Town Industrial Park, achieving direct-bend routing at outdoor turns and reducing overall costs by 10%.
View Details
Guangzhou Huachuang Park Industrial and Commercial Energy Storage Project
An industrial park energy storage system in Panyu District, Guangzhou, deploying 1000A, 500A and 300A flexible busbars in buried-pipe routing from PCS outlet to low-voltage cabinet busbar with superior heat dissipation and aesthetics.
View Details
Shanghai Jiading All-Day Charging Station Project
An outdoor EV charging station in Jiading District, Shanghai, using Yanghua 800A flexible busbars with enhanced protection levels to deliver stable and efficient power supply to charging pile infrastructure in an exposed outdoor environment.
View Details
Hunan Factory Rooftop Distributed Photovoltaic Project
A 1000A high-current flexible busbar solution for a factory rooftop PV project in Hunan, connecting the grid-connected cabinet to the transformer with fewer joints, stable carrying capacity, and significant labor and time savings.
View Details
Shenzhen SCPG Center Huawei 600kW Supercharging Station
A national climate investment demonstration project featuring Yanghua's patented 3200A and 800A flexible busbars powering Huawei's 600kW liquid-cooled supercharging hosts, delivering 200 km range in a coffee break for commercial EV fleets.
View Details
Guangzhou Panyu Industrial and Commercial Energy Storage Project
An industrial and commercial energy storage system in Panyu, Guangzhou, deploying TMRVV-500A, TMRVV-1250A, and TMRVV-1600A flexible busbars with integrated laying to connect power distribution and grid-connected cabinets in a tight-schedule, space-constrained project.
View DetailsNo projects found
Try adjusting your filters or search terms.