This project involved a data center facility in Hangzhou where the owner had initially planned to use a four-split cable solution for connecting power cabinets to bus ducts. However, the construction space proved too confined, making cable laying extremely difficult. Yanghua's single-run flexible busbar solution provided sufficient current carrying capacity without the need for additional paralleled assemblies. The compact form factor, high flexibility, and ease of installation enabled efficient deployment within the restricted space. With IP68-rated protection and excellent insulation performance, the busbar solution ensured safe and reliable power distribution throughout the data center.
Project Background & Challenges
The data center's confined construction space made the originally planned four-split cable solution impractical, creating significant difficulties in cable laying and routing between power cabinets and bus ducts.
- Confined construction space that made traditional multi-cable laying extremely difficult
- Four-split cable solution required excessive physical space for routing and installation
- Need for high current carrying capacity without paralleling multiple cable runs
- Strict insulation and safety requirements for data center power distribution infrastructure
Solution
Yanghua replaced the multi-cable plan with a single-run flexible busbar system that delivered the required current carrying capacity in a compact, highly flexible form factor, enabling straightforward installation within the restricted space while achieving IP68-rated insulation performance.
- Single flexible busbar run replaced the four-split cable assembly, drastically reducing space requirements
- Compact busbar profile and high flexibility enabled routing through tight construction spaces that cables could not navigate
- IP68-rated protection and superior insulation performance ensured safe, reliable data center operation
- Simplified single-run installation eliminated the complexity and labor associated with paralleling multiple cables
Project Results
Products Used
Related Projects
Explore similar industrial busbar installation cases
Huawei Data Center Expansion
High-density flexible busbar solution for cloud infrastructure expansion with advanced electrical busbar systems
Power Capacity Expansion Project for Data Center of a Scientific Research Institution in Shenzhen
Flexible busbar solution for a data computer room power capacity expansion, connecting low-voltage cabinets to PDUs and precision cooling equipment in a Shenzhen research facility.
Changsha Telecom Building Internal Power System Project
Implemented flexible busbar for connecting low-voltage cabinets to UPS power cabinets across four floors of the Changsha Telecom Building, using vertical shaft installation with compact, lightweight, joint-free continuous runs.
Inquire About Similar Projects
Get Quote for Similar Project
Connect this project to the next decision
Review the related product range, application solution, technical hub, and engineering quotation path for a comparable installation.