CATL Energy Storage
New Energy Project Case

CATL Energy Storage

Providing professional flexible busbar solutions for CATL

Project Location

Ningde, China

Completion Date

December 2023

Project Scale

2500A system

Project Duration

6 months

CATL Energy Storage

Client: CATLIndustry: New EnergyLocation: Ningde, ChinaDuration: 6 monthsCompletion Date: December 2023

Project Background & Challenges

  • High-capacity power distribution requirements for electrical busbar systems
  • Demanding reliability standards for flexible busbar solution
  • Fast response time requirements with copper busbar technology
  • Energy density optimization using high current busbar systems

Solution

  • 2500A high current busbar system with flexible busbar technology
  • Redundant architecture design using electrical busbar systems
  • Advanced monitoring capabilities
  • Real-time response optimization

Project Results

99.9%
System Reliability
<10ms
Response Time
30% improvement
Energy Density
20%
Operational Cost Reduction

Products Used

2500A High Current Busbar SystemsRedundant flexible busbar power pathsReal-time monitoring for electrical busbarThermal management with copper busbar technology

Project Gallery

Project image 1

Client Testimonial

"Exceptional performance in our energy storage applications with outstanding reliability using flexible busbar solution and electrical busbar systems."

Chen Hua

Technical Director

Project Information

Client
CATL
Industry
New Energy
Location
Ningde, China
Project Scale
2500A system