New Energy

CATL Energy Storage

CATL

Project Location
Ningde, China
Completion Date
December 2023
Project Scale
2500A system
Project Duration
6 months

This project involved the implementation of a high-capacity electrical busbar systems solution for CATL's battery energy storage facility. The 2500A high current busbar system was designed with redundant architecture and advanced monitoring capabilities to meet demanding reliability standards. The flexible busbar solution achieved 99.9% system reliability with response times under 10ms, significantly improving energy density by 30% and reducing operational costs by 20% through advanced copper busbar technology.

Project Background & Challenges

Implement a high-capacity electrical busbar systems solution for battery energy storage facility with demanding reliability standards and fast response requirements using flexible busbar technology.

  • High-capacity power distribution requirements for electrical busbar systems
  • Demanding reliability standards for flexible busbar solution
  • Fast response time requirements with copper busbar technology
  • Energy density optimization using high current busbar systems

Solution

Deployed 2500A high current busbar system with redundant architecture and advanced monitoring capabilities to meet demanding reliability standards, utilizing flexible copper busbar manufacturer expertise.

  • 2500A high current busbar system with flexible busbar technology
  • Redundant architecture design using electrical busbar systems
  • Advanced monitoring capabilities
  • Real-time response optimization

Project Results

99.9%
System Reliability
<10ms
Response Time
30% improvement
Energy Density
20%
Operational Cost Reduction

Products Used

2500A High Current Busbar SystemsRedundant flexible busbar power pathsReal-time monitoring for electrical busbarThermal management with copper busbar technology