New Energy Project Case
CATL Energy Storage
Providing professional flexible busbar solutions for CATL
Project Location
Ningde, China
Completion Date
December 2023
Project Scale
2500A system
Project Duration
6 months
CATL Energy Storage
Client: CATLIndustry: New EnergyLocation: Ningde, ChinaDuration: 6 monthsCompletion Date: December 2023
Project Background & Challenges
- •High-capacity power distribution requirements for electrical busbar systems
- •Demanding reliability standards for flexible busbar solution
- •Fast response time requirements with copper busbar technology
- •Energy density optimization using high current busbar systems
Solution
- •2500A high current busbar system with flexible busbar technology
- •Redundant architecture design using electrical busbar systems
- •Advanced monitoring capabilities
- •Real-time response optimization
Project Results
99.9%
System Reliability
<10ms
Response Time
30% improvement
Energy Density
20%
Operational Cost Reduction
Products Used
2500A High Current Busbar SystemsRedundant flexible busbar power pathsReal-time monitoring for electrical busbarThermal management with copper busbar technology
Project Gallery

Client Testimonial
"Exceptional performance in our energy storage applications with outstanding reliability using flexible busbar solution and electrical busbar systems."
Chen Hua
Technical Director
Project Information
Client
CATL
Industry
New Energy
Location
Ningde, China
Project Scale
2500A system