50MW Solar Farm Power Distribution
New Energy Project Case

50MW Solar Farm Power Distribution

Providing professional flexible busbar solutions for Ningxia Solar Energy Co.

Project Location

Ningxia, China

Completion Date

March 2024

Project Scale

50MW Solar Farm, 2000A Flexible Busbar System

Project Duration

6 months

50MW Solar Farm Power Distribution

Client: Ningxia Solar Energy Co.Industry: New EnergyLocation: Ningxia, ChinaDuration: 6 monthsCompletion Date: March 2024

Project Background & Challenges

  • High voltage drop in traditional cable solutions vs flexible busbar solution
  • Complex installation requirements for electrical busbar systems
  • Difficult maintenance access with flexible busbar solution
  • System reliability optimization using electrical busbar systems

Solution

  • 2000A high-current flexible busbar solution system
  • Optimized layout design with electrical busbar systems
  • Reduced connection points using flexible busbar solution
  • Enhanced system reliability features for electrical busbar

Project Results

35%
Power Loss Reduction
60%
Installation Time Reduction
8%
System Efficiency Improvement
40%
Maintenance Cost Reduction

Products Used

2000A Flexible Busbar Solution SystemsConnection terminals for electrical busbarInsulation accessories for flexible busbarMonitoring system for electrical busbar systems

Project Gallery

Project image 1

Client Testimonial

"Yanghua Tech's flexible busbar solution not only solved our technical challenges but also greatly improved the overall project efficiency with advanced electrical busbar systems. The professional technical support team ensured smooth project progress using reliable flexible busbar solution technology."

Engineer Zhang

Project Technical Director

Project Information

Client
Ningxia Solar Energy Co.
Industry
New Energy
Location
Ningxia, China
Project Scale
50MW Solar Farm, 2000A Flexible Busbar System

Inquire About Similar Projects