New Energy Project Case
50MW Solar Farm Power Distribution
Providing professional flexible busbar solutions for Ningxia Solar Energy Co.
Project Location
Ningxia, China
Completion Date
March 2024
Project Scale
50MW Solar Farm, 2000A Flexible Busbar System
Project Duration
6 months
50MW Solar Farm Power Distribution
Client: Ningxia Solar Energy Co.Industry: New EnergyLocation: Ningxia, ChinaDuration: 6 monthsCompletion Date: March 2024
Project Background & Challenges
- •High voltage drop in traditional cable solutions vs flexible busbar solution
- •Complex installation requirements for electrical busbar systems
- •Difficult maintenance access with flexible busbar solution
- •System reliability optimization using electrical busbar systems
Solution
- •2000A high-current flexible busbar solution system
- •Optimized layout design with electrical busbar systems
- •Reduced connection points using flexible busbar solution
- •Enhanced system reliability features for electrical busbar
Project Results
35%
Power Loss Reduction
60%
Installation Time Reduction
8%
System Efficiency Improvement
40%
Maintenance Cost Reduction
Products Used
2000A Flexible Busbar Solution SystemsConnection terminals for electrical busbarInsulation accessories for flexible busbarMonitoring system for electrical busbar systems
Project Gallery

Client Testimonial
"Yanghua Tech's flexible busbar solution not only solved our technical challenges but also greatly improved the overall project efficiency with advanced electrical busbar systems. The professional technical support team ensured smooth project progress using reliable flexible busbar solution technology."
Engineer Zhang
Project Technical Director
Project Information
Client
Ningxia Solar Energy Co.
Industry
New Energy
Location
Ningxia, China
Project Scale
50MW Solar Farm, 2000A Flexible Busbar System