Zhongshan Garden Factory Power Distribution Room Project
Back to Projects
Industrial

Zhongshan Garden Factory Power Distribution Room Project

Confidential

Project Location
Zhongshan, Guangdong, China
Completion Date
July 2025
Project Scale
1000A system
Project Duration
N/A

This project is located at a garden-style factory in Zhongshan, Guangdong. The factory required an efficient solution to interconnect multiple power distribution cabinets using 1000A-rated conductors. Yanghua's 1000A universal flexible busbars were selected for their compact dimensions paired with high current carrying capacity. The busbars eliminated the need for multiple conductor joints, and for long-distance trench laying sections, no intermediate splices were required at all. This approach delivered a convenient and highly efficient installation process, reducing both material costs and on-site labor while maintaining full electrical performance across the distribution network.

Project Background & Challenges

The factory required interconnecting multiple power distribution cabinets, including sections requiring long-distance trench laying, where conventional rigid busbar systems would demand numerous intermediate joints, increasing cost, installation complexity, and potential failure points.

  • Requirement to interconnect multiple power distribution cabinets across the factory floor
  • Long-distance trench laying sections that would need numerous joints with conventional busbar systems
  • Need for compact conductor form factor to fit within existing cable trenches
  • High current capacity (1000A) requirement without compromising on installation efficiency

Solution

Yanghua supplied 1000A universal flexible busbars with high current capacity in a compact form factor, enabling joint-free long-distance trench laying and simple cabinet-to-cabinet connections without multiple splices, resulting in an efficient and cost-effective installation.

  • Deployed 1000A universal flexible busbars capable of joint-free long-distance trench laying
  • Compact conductor dimensions fit easily within existing trench infrastructure
  • Single-conductor design eliminated multiple splices, reducing material costs and installation time
  • High current carrying capacity in a small form factor provided efficient factory power distribution

Project Results

100%
Intermediate Joint Elimination
40%
Trench Installation Time Reduction
25%
Material Cost Savings
35%
Installation Labor Reduction

Products Used

1000A Universal Flexible Busbar