Foshan Home Appliance Manufacturing Factory — 2500A Flexible Busbar Retrofit with Bus Duct Integration
Confidential
This project is located in a home appliance manufacturing plant in Nanhai District, Foshan. The high-current flexible busbar installation was successfully powered on August 15, 2024. The project uses 1250A high-current flexible busbars, which can achieve 2500A total capacity through single and double operation configuration. The project was time-critical, the construction space was small, and the new flexible busbar system needed to overlap and integrate with the existing bus duct. Yanghua's high-current flexible busbars are easy to install and lay, with convenient overlapping methods that saved significant installation time, space, and cost for the project.
Project Background & Challenges
The home appliance manufacturing plant required a rapid 2500A power distribution upgrade within a very tight deadline. The installation space was small, and the new system had to integrate seamlessly with existing bus duct infrastructure without disrupting ongoing operations.
- Time-critical project with a hard power-on deadline requiring accelerated installation and commissioning
- Small construction space demanded a flexible, compact busbar solution that could fit the confined routing area
- New flexible busbar system needed to overlap and integrate with existing bus duct infrastructure seamlessly
- 2500A total capacity requirement had to be met without extensive structural modifications or space expansion
Solution
Yanghua supplied 1250A high-current flexible busbars configurable in single and double operation to reach 2500A total capacity. The easy-to-install, space-efficient design enabled quick deployment and convenient overlapping with the existing bus duct, completing the project on time and within the confined space.
- Supplied 1250A high-current flexible busbars configurable in single and double operation to achieve 2500A total capacity
- Flexible busbar design enabled easy installation and convenient overlapping with the existing bus duct system
- Compact form factor maximized space utilization in the confined installation area without structural modification
- Plug-and-play deployment approach met the tight power-on deadline without compromising on quality or safety
Project Results
Products Used
Project Gallery
Inquire About Similar Projects
Get Quote for Similar Project