Old Factory Building Renovation in Dongguan Industrial Park
Confidential
This project involved the renovation of an aging factory building within an industrial park in Dongguan, Guangdong. The power distribution system required a reliable and efficient upgrade to support modern manufacturing operations. Yanghua deployed FS-TMRYY series rodent-proof flexible busbars in multiple ratings — 400A, 630A, 1000A, and 1250A — utilizing integrated joint-free laying with terminal copper bar crimping. The busbars were routed through cable trenches and along cable bridges, delivering a compact, aesthetically clean installation that substantially reduced construction complexity, space consumption, and overall project cost compared to conventional cabling methods.
Project Background & Challenges
The aging factory building required a complete electrical infrastructure overhaul with strict demands for high current-carrying capacity, rodent resistance in an industrial environment, and limited available space for cable routing. The conventional multi-cable approach would have resulted in excessive joints, complex installation paths, and poor aesthetics.
- Aging electrical infrastructure requiring complete replacement across multiple current ratings
- Industrial environment demanding rodent-proof cable protection to ensure long-term reliability
- Limited cable trench and bridge space necessitating a compact, high-density power routing solution
- Need to minimize construction joints to reduce potential failure points and installation time
Solution
Yanghua provided FS-TMRYY rodent-proof flexible busbars across four current ratings (400A to 1250A), enabling integrated joint-free laying with terminal copper bar crimping. This approach eliminated intermediate joints, simplified routing through cable trenches and bridges, and delivered a clean, professional installation.
- Deployed FS-TMRYY rodent-proof flexible busbars in 400A, 630A, 1000A, and 1250A ratings for full coverage of all distribution requirements
- Implemented joint-free integrated laying with terminal copper bar crimping, eliminating intermediate splice points entirely
- Utilized cable trench and bridge routing to maximize space efficiency and installation aesthetics
- Single-run flexible busbars replaced multi-cable parallel configurations, reducing material handling and labor requirements
Project Results
Products Used
Project Gallery
Related Projects
Explore similar industrial busbar installation cases
Midea Industrial Complex
Modern industrial busbar applications for manufacturing facility upgrade with flexible copper busbar manufacturer solutions
Intelligent Manufacturing Base Project of a Major Energy Group in Deyang, Sichuan
Large-scale flexible busbar deployment for a modern intelligent manufacturing base, providing 6400A to 1000A multi-specification power distribution across complex cable trench and bridge routing paths.
New Materials Technology Industrial Park Project in Fuzhou, Fujian
Flexible busbar solution for a new materials industrial park production line in Fuzhou, where embedded conduit constraints and multi-turn routing paths demanded a high-flexibility power distribution approach.
Inquire About Similar Projects
Get Quote for Similar Project
Connect this project to the next decision
Review the related product range, application solution, technical hub, and engineering quotation path for a comparable installation.