New Energy Vehicle Equipment Manufacturing Plant Renovation, Chongqing
Back to Projects
New Energy

New Energy Vehicle Equipment Manufacturing Plant Renovation, Chongqing

Confidential

Project Location
Chongqing, China
Completion Date
August 2025
Project Scale
N/A
Project Duration
N/A

This renovation project for a new energy vehicle equipment manufacturing plant in Chongqing faced the critical challenge of extremely limited construction space combined with complex wiring requirements. The original design relied on multiple parallel cable runs, which proved difficult to route and install within the confined plant layout. Yanghua flexible busbars were deployed as a direct replacement for the multi-cable solution. The compact physical dimensions and high bending flexibility of the busbar products significantly reduced wiring difficulty, allowing installers to route power conductors through spaces that were previously inaccessible with conventional cables. The flexible busbar solution proved far more suitable for construction and long-term operation within the narrow spatial constraints of the manufacturing facility.

Project Background & Challenges

The equipment manufacturing plant renovation presented severely limited construction space where traditional multi-cable power distribution was impractical to install and route, causing excessive wiring complexity and installation difficulty.

  • Extremely limited construction space in the manufacturing plant rendering conventional multi-cable routing unfeasible
  • High wiring complexity from the original multi-cable design that created installation bottlenecks and safety concerns
  • Narrow equipment corridors and tight clearances requiring conductors with minimal bend radius and compact cross-section
  • Need for a solution suitable for both construction-phase installation and long-term operational reliability in a confined industrial environment

Solution

Yanghua deployed compact, high-flexibility flexible busbars as a direct replacement for the original multi-cable scheme, dramatically simplifying the wiring layout and enabling safe installation within the plant's narrow spatial constraints.

  • Replaced the entire multi-cable distribution scheme with Yanghua flexible busbars, consolidating multiple cable runs into compact single conductors
  • Utilized the small cross-sectional profile and high flexibility of flexible busbars to route through previously inaccessible narrow spaces
  • Simplified the overall wiring layout, reducing installation complexity and shortening onsite construction time
  • Delivered a robust, maintenance-friendly power distribution system suited for continuous operation in a space-constrained manufacturing environment

Project Results

Multi-cable scheme fully replaced
Cable Run Consolidation
Significantly simplified routing layout
Wiring Complexity Reduction
Accessible installation in previously unusable areas
Space Utilization Improvement
Onsite bend-to-fit without pre-customization
Installation Adaptability

Products Used

Flexible Busbar (multi-cable replacement solution)

Inquire About Similar Projects