Shenzhen Beterui New Energy — IP68 Flexible Busbar Long-Distance Inter-Building Connection
Back to Projects
New Energy

Shenzhen Beterui New Energy — IP68 Flexible Busbar Long-Distance Inter-Building Connection

Confidential

Project Location
Shenzhen, Guangdong, China
Completion Date
December 2024
Project Scale
1600A system
Project Duration
N/A

The Beterui new industrial project is located in Guangming District, Shenzhen. The project deploys a universal flexible busbar rated at 1600A in double-split configuration, meeting the facility's 3200A total power load requirement. The newly constructed factory buildings span a large area and require inter-building power connections. The laying environment includes both indoor and outdoor sections, with a long and complex routing path. Yanghua's high-current flexible busbar complies with IP68 standards and is laid within cable bridges. The product's small size and light weight allow neat, organized arrangement in the bridge with a clean appearance. The flexible busbar supports long-distance laying over thousands of meters without intermediate joints. For the large factory area, it also enables integrated single-body laying, reducing construction processes and accessory requirements, which greatly shortens the construction period and reduces cost.

Project Background & Challenges

The new energy company's large factory complex required reliable inter-building power connections spanning thousands of meters through mixed indoor and outdoor environments. The long distances, complex routing, and environmental exposure demanded a high-protection, joint-free solution that could maintain 3200A capacity across the entire run.

  • New factory buildings required long-distance inter-building power connections spanning thousands of meters across a large site
  • Mixed indoor and outdoor laying environment demanded high environmental protection rating to ensure long-term reliability
  • Traditional cabling would require numerous intermediate joints over long distances, each introducing potential failure points
  • Large factory area needed an integrated, joint-free cabling approach to minimize construction complexity and accessory count

Solution

Yanghua provided 1600A double-split universal flexible busbars with IP68 protection, laid within cable bridges. The solution enables integrated long-distance laying over thousands of meters without any intermediate joints, with neat and organized bridge routing suitable for both indoor and outdoor sections.

  • Deployed 1600A double-split universal flexible busbars delivering 3200A total capacity through pair configuration
  • IP68-rated flexible busbars laid within cable bridges for clean, organized routing suitable for outdoor and indoor environments
  • Long-distance integrated laying capability eliminated intermediate joints entirely across thousands of meters
  • Compact, lightweight busbar design enabled neat, space-efficient arrangement within bridge trays with professional appearance

Project Results

Thousands of meters achieved without a single intermediate joint
Laying Distance
IP68 — fully suitable for mixed indoor/outdoor installation environment
Protection Rating
Significantly reduced through integrated single-body laying and fewer accessories
Construction Period
Minimized — no mid-run joints required across the entire distance
Accessories and Connectors

Products Used

1600A Double-Split Universal Flexible Busbar (IP68 Rated)