Shenzhen Beterui New Energy — IP68 Flexible Busbar Long-Distance Inter-Building Connection
Back to Projects
New Energy

Shenzhen Beterui New Energy — IP68 Flexible Busbar Long-Distance Inter-Building Connection

Confidential

Project Location
Shenzhen, Guangdong, China
Completion Date
December 2024
Project Scale
1600A system
Project Duration
N/A

The Beterui new industrial project is located in Guangming District, Shenzhen. The project deploys a universal flexible busbar rated at 1600A in double-split configuration, meeting the facility's 3200A total power load requirement. The newly constructed factory buildings span a large area and require inter-building power connections. The laying environment includes both indoor and outdoor sections, with a long and complex routing path. Yanghua's high-current flexible busbar complies with IP68 standards and is laid within cable bridges. The product's small size and light weight allow neat, organized arrangement in the bridge with a clean appearance. The flexible busbar supports long-distance laying over thousands of meters without intermediate joints. For the large factory area, it also enables integrated single-body laying, reducing construction processes and accessory requirements, which greatly shortens the construction period and reduces cost.

Project Background & Challenges

The new energy company's large factory complex required reliable inter-building power connections spanning thousands of meters through mixed indoor and outdoor environments. The long distances, complex routing, and environmental exposure demanded a high-protection, joint-free solution that could maintain 3200A capacity across the entire run.

  • New factory buildings required long-distance inter-building power connections spanning thousands of meters across a large site
  • Mixed indoor and outdoor laying environment demanded high environmental protection rating to ensure long-term reliability
  • Traditional cabling would require numerous intermediate joints over long distances, each introducing potential failure points
  • Large factory area needed an integrated, joint-free cabling approach to minimize construction complexity and accessory count

Solution

Yanghua provided 1600A double-split universal flexible busbars with IP68 protection, laid within cable bridges. The solution enables integrated long-distance laying over thousands of meters without any intermediate joints, with neat and organized bridge routing suitable for both indoor and outdoor sections.

  • Deployed 1600A double-split universal flexible busbars delivering 3200A total capacity through pair configuration
  • IP68-rated flexible busbars laid within cable bridges for clean, organized routing suitable for outdoor and indoor environments
  • Long-distance integrated laying capability eliminated intermediate joints entirely across thousands of meters
  • Compact, lightweight busbar design enabled neat, space-efficient arrangement within bridge trays with professional appearance

Project Results

Thousands of meters achieved without a single intermediate joint
Laying Distance
IP68 — fully suitable for mixed indoor/outdoor installation environment
Protection Rating
Significantly reduced through integrated single-body laying and fewer accessories
Construction Period
Minimized — no mid-run joints required across the entire distance
Accessories and Connectors

Products Used

1600A Double-Split Universal Flexible Busbar (IP68 Rated)

Project Gallery

Inquire About Similar Projects

Get Quote for Similar Project

Connect this project to the next decision

Review the related product range, application solution, technical hub, and engineering quotation path for a comparable installation.