Rooftop Distributed Photovoltaic Power Station in Nanchang, Jiangxi
Back to Projects
New Energy

Rooftop Distributed Photovoltaic Power Station in Nanchang, Jiangxi

Confidential

Project Location
Nanchang, Jiangxi, China
Completion Date
June 2025
Project Scale
N/A
Project Duration
N/A

This project, located in Nanchang, Jiangxi Province, involved connecting medium- and low-voltage cabinets to the converging cabinets of a rooftop distributed photovoltaic power station. Yanghua's flexible busbar was selected for its high flexibility, which allows direct turning without additional joints or connectors, making cable routing and laying remarkably straightforward. The installation benefited from the busbar's ability to navigate the rooftop's structural constraints easily, reducing overall installation complexity and time while ensuring reliable electrical connections throughout the photovoltaic distribution system.

Project Background & Challenges

The rooftop photovoltaic power station required reliable connections between medium/low-voltage cabinets and converging cabinets in a constrained rooftop environment where rigid busbar routing would have been difficult and time-consuming.

  • Rooftop installation space was constrained, requiring a connection solution that could adapt to tight layout conditions
  • Routing between medium/low-voltage cabinets and converging cabinets involved multiple directional changes
  • Rigid busbar or multi-cable solutions would have required numerous joints and extended installation time
  • The distributed PV system required a reliable, low-maintenance electrical connection for long-term rooftop operation

Solution

Yanghua's flexible busbar was used to connect the cabinets, with its high flexibility enabling direct turning and easy laying without requiring additional joints or complex prefabrication.

  • Flexible busbar enabled direct turning at any angle without additional joints, adapting effortlessly to the rooftop layout
  • Simplified point-to-point connections between medium/low-voltage cabinets and converging cabinets
  • Reduced the number of connection points compared to cable-based solutions, improving overall system reliability
  • Quick and straightforward installation minimized disruption to the rooftop environment and shortened the construction period

Project Results

Significantly improved
Installation Efficiency
Reduced vs. conventional cable solution
Connection Points
Direct turning without extra joints
Routing Flexibility
Shortened
Construction Period

Products Used

Flexible Busbar (Medium-to-Low Voltage Cabinet Connection)