Aofeng Energy Storage Project in Dongguan Industrial Park, Guangdong
Aofeng Energy
The energy storage project in an industrial park in Dongguan, Guangdong, connected the energy storage converging cabinet to the low-voltage power distribution room using Yanghua's flexible busbar. The client, Aofeng Energy, has repurchased flexible busbars multiple times since the previous year for various industrial park energy storage projects, demonstrating strong confidence in the product. The 2000A universal flexible busbar deployed in this project features high flexibility, IP68 protection rating, and integrated jointless laying -- making it particularly well-suited for outdoor trench installation. This solution saved significant time and labor compared to conventional connection methods.
Project Background & Challenges
The energy storage converging cabinet needed a reliable 2000A connection to the low-voltage distribution room across outdoor trench routes, where conventional connection methods would be labor-intensive and prone to environmental degradation over time.
- Energy storage converging cabinet required a 2000A-rated connection to the low-voltage distribution room across outdoor terrain
- Outdoor trench installation demanded robust environmental protection to prevent moisture ingress and joint degradation
- Conventional rigid busbar or multi-cable solutions would have required extensive labor for installation and joint fabrication
- The client required a proven solution that could be standardized across multiple industrial park energy storage projects
Solution
Yanghua's 2000A universal flexible busbar with IP68 protection and integrated jointless laying was deployed, delivering a time-saving, labor-saving solution that prompted repeat procurement by the client across multiple projects.
- Deployed 2000A universal flexible busbar with IP68 protection for reliable outdoor trench laying
- Integrated jointless design eliminated mid-span connections, reducing installation time and long-term maintenance needs
- High flexibility enabled the busbar to adapt to trench routing without requiring custom-bent rigid sections
- Proven product performance led to repeat procurement by Aofeng Energy for multiple subsequent projects
Project Results
Products Used
Project Gallery
Inquire About Similar Projects
Get Quote for Similar Project